Asphalt and road service supports remodeling by establishing or restoring driveways, access lanes, parking pads, walkways, and utility cuts. Work spans site verification and utility locates, grading and subgrade proof-rolling, aggregate base installation, edge restraint, and hot-mix asphalt placement with proper lift thickness and compaction. It also covers trench restoration, pothole repair, mill-and-overlay, crack sealing, sealcoating, light striping, and clean tie-ins to concrete, pavers, and thresholds. Planning addresses drainage, permits, traffic control, and seasonal temperature windows, with documentation for mix, joints, compaction, and open-to-traffic timing.
Applications
- New or replacement driveways and access roads
- Parking pads, turnouts, and service aprons
- Trench and utility cut restoration after upgrades
- Walkways and site paths (asphalt or permeable options)
- Edge transitions at garage slabs, curbs, and pavers
Process overview
- Survey and layout: limits, elevations, and drainage path
- Utility locates (call before you dig) and access planning
- Excavation, subgrade proof-rolling, and remediation of soft spots
- Base installation: graded aggregate, moisture conditioning, and compaction
- Tack coat at interfaces; asphalt placement by paver or hand
- Compaction: steel drum and plate tamping at edges and joints
- Joints, edges, and transitions finished to adjacent materials
- Clean-up, barricades, and open-to-traffic timing
Drainage and grading
- Target slopes for positive drainage away from structures
- Swales, catch basins, and trench drains at low points
- Permeable asphalt or paver zones where infiltration is approved
- Freeze–thaw considerations and runoff paths to compliant outlets
Materials and assemblies
- Hot-mix asphalt lifts suited to climate and loading
- Aggregate base and geotextiles for separation and stability
- Edge restraints: concrete, paver soldiers, or asphalt berms
- Sealcoats (asphalt-emulsion; coal-tar alternatives where banned)
- Crack sealants and cold patch for targeted maintenance
Tie-ins and coordination
- Transitions to garage slabs, sidewalks, and stone or paver fields
- Clearances for gates, doors, and drainage grates
- Scheduling with utility, landscape, concrete, and delivery access needs
- Traffic control: cones, signage, and flagging where required
Quality benchmarks
- Uniform slope with no ponding at the surface
- Compaction meeting target density; stable edges and joints
- Clean, straight lines at borders and accurate tie-in elevations
- Mix and lift thickness documented; temperature observed during placement
Maintenance and care
- Post-install traffic limits and turning restrictions during initial cure
- Periodic crack sealing and sealcoating per climate and use
- Prompt patching of utility cuts or localized failures
- Keep drains clear; avoid de-icers that damage adjacent finishes
Typical timeline
- Survey, layout, and locates: 1–5 days (locate timing varies)
- Excavation and base prep: 1–2 days for a standard driveway
- Paving and compaction: same day for small areas; 1–2 days for larger scopes
- Open to light traffic: typically 24–48 hours (climate dependent)
Limits and considerations
- Weather and temperature windows affect placement and compaction
- Subgrade moisture or poor soils may require stabilization
- Permits, inspections, and curb-cut approvals may be required
- Loads from heavy equipment and dumpsters influence section design
Deliverables at completion
- Mix design, lift thickness, and compaction notes
- Joint and edge locations with photos of tie-ins
- Open-to-traffic guidance and maintenance recommendations
- As-built sketch of drainage features and any subsurface work
Well-prepared subgrades, controlled slopes, and clean transitions produce asphalt work that looks tidy on day one and weathers predictably over time.